Dredging Project

Dredge Operations
The Storm Lake Dredge on Storm Lake 2009 The Storm Lake Dredging Project continues to make remarkable improvements in the water quality of Lake Storm Lake through the removal of silt from the lake. The current project is operational from April to November annually and includes the operation of a main dredge boat, booster pump, and a silt containment site that returns clean water back to the lake.

During the projects operations (April to November annually) it is IMPORTANT THAT BOATERS ARE AWARE OF THE DREDGE OPERATION AND REMAIN AT LEAST 100 FEET AWAY FROM THE DREDGE, BOOSTER PUMP AND DREDGE PIPING AT ALL TIMES.

PICT0067.JPG
The project is operated by the Lake Improvement Commission.

For more information on boater safety around the Dredge Operation please visit our Dredge Safety Page.